WARREN has been awarded the following contracts
S/No | Name of the Employer | Name, Location and Type of project | Date of commencement | Status | Contract Value | ||||||||||||||||||||||||||||||||||||||||||||||||
1 | NKG Coffe Mills (K) Ltd | Proposed New Warehouse at NKG Complex- Structural Steel Works-Ruiru-Kiambu County | May-19 | On-Going | 24,250,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
2 | NKG Coffe Mills (K) Ltd | Proposed New Warehouse at NKG Complex- Building and Civil Works-Ruiru-Kiambu County | May-19 | On-Going | 53,353,726.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
3 | KTDA | Proposed Production Building expansion KTDA Olenguruone Tea Factory | Mar-19 | On-Going | 21,952,988.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
4 | KTDA | Proposed Withering and Building Expansion of Structural Steel Works at Itumbe Tea Factory | Feb-19 | On-Going | 12,561,068.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
5 | D Manji Construction Ltd | Proposed Construction of Nairobi Gate Industrial Park- Pressed Steel Water Storage tanks | Feb-19 | On-Going | 58,551,904.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
6 | KTDA | Proposed Kangaita Speciality Tea Factory-Structural Steel Works | Dec-18 | On-Going | 35,055,654.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
7 | Vanguard Engineering Ltd | Dismantling of existing tank, supply and installation of new 650,000 litres pressed steel tank on 30m tower at JKIA-Nairobi County | Jul-18 | Jan-19 | 5,730,817.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
8 | Team and Team International | Fabrication and Installation of Elevated pressed steel Water Tank | Jun-18 | Aug-18 | 3,174,920.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
9 | Barda Enterprises | Fabrication and Installation of Elevated pressed steel Water Tank | Jun-18 | Aug-18 | 5,400,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
10 | Chemusian Tea Estates Ltd | Proposed Construction of Chemusian Tea Factory- Building, Civil and Structural Steel Works-Nakuru County | Apr-18 | On-Going | 426,561,800.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
11 | KTDA | Proposed Nyansiongo Tea Factory- Structural Steel Works & Cladding at Matunwa-Nyamira County | Mar-18 | Nov-18 | 42,120,366.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
12 | Alliance Media | Supply of Billboards | Nov-17 | Apr-18 | 6,960,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
13 | KTDA | Proposed Production Building expansion and new generator house for Muchimikuru Tea Factory | Oct-17 | Mar-18 | 6,135,290.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
14 | Trax Kenya Ltd | Fabrication and Installation of Elevated pressed steel Water Tank | Sep-17 | Nov-17 | 4,523,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
15 | Bidco Africa Ltd | Supply and installation of 3,000,000 litres vertical water storage tank as per API 650 | Sep-17 | Dec-17 | 15,660,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
16 | Bidco Africa Ltd | Fabrication and Installation of pipe bridge | Jul-17 | Aug-17 | 1,201,841.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
17 | KTDA | Jacking up of withering building-structural steel works at Kapsara Tea Factory | Jun-17 | Sep-17 | 10,316,845.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
18 | Kipsigis Multi-Purpose Co- operative | Proposed Kipsigis Multi-Purpose Tea Factory- Structural Steel Works-Kericho County | Jun-17 | Nov-18 | 54,030,527.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
19 | Kipsigis Multi-Purpose Co- operative | Proposed Kipsigis Multi-Purpose Tea Factory-Building and Civil Works-Kericho County | Jun-17 | Nov-18 | 155,022,426.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
20 | KTDA | Proposed Tombe Tea Factory-Structural Steel Works at Sombogo site-Kisii County | May-17 | Aug-17 | 49,604,593.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
21 | Al Nasir Trading Co. | Fabrication and Installation of Elevated pressed steel Water Tank | Apr-17 | May-17 | 5,258,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
22 | Dirie and Sons Company | Fabrication and Installation of Elevated pressed steel Water Tank | Mar-17 | Apr-17 | Kshs. 7,745,877.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
23 | Parma Medical Equipment | Fabrication, delivery of steel structures | Nov-16 | Dec-16 | Kshs.7,048,160.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
24 | Jade Petroleum | Fabrication and installation of vertical Diesel storage Tanks | Aug-16 | May-17 | USD 196,00.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
25 | Kenya Power & Lightning Co. Ltd | Supply and Installation of fuel tanks at Merti Power Station | Jun-16 | Nov-16 | Kshs. 8,858,108.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
26 | Trax Kenya Ltd | Fabrication and installation of Low and High level tanks | Jun-16 | Jul-16 | Kshs. 21,451,764.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
27 | Altima Projects Managers | Construction of Fuel Station proposed Multi Use Development , Moi South Lake Road Naivasha | May-16 | Aug-16 | Kshs. 19,823,839.38 | ||||||||||||||||||||||||||||||||||||||||||||||||
28 | Sameer Agriculture & Livestock Ltd | Construction of a Milk Processing Plant at Nakuru | Apr-16 | Jul-17 | Kshs. 232,044,286.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
29 | Northern Water Services Board | Fabrication and Installation of Ex- warren pressed steel Water Tank | Apr-16 | May-16 | Kshs. 6,997,120.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
30 | Garissa Water & Sewerage Co Ltd | Fabrication and Installation of Ex- warren pressed steel Water Tank | Apr-16 | May-17 | Kshs. 5,280,320.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
31 | Jastaline Holdings Limited | Supply, Installation, testing and Commisioning of Water Tank, Parking Lot and Underground concrete water tank | Apr-16 | Jul-16 | Kshs. 12,790,511.48 | ||||||||||||||||||||||||||||||||||||||||||||||||
32 | Lean Energy Solutions Limited | Proposed Bagass godown in Mai Mahiu | Apr-16 | Nov-16 | Kshs. 19,443,391.04 | ||||||||||||||||||||||||||||||||||||||||||||||||
33 | Kipkebe Limited | Construction of Secondary School | May-15 | Jan-16 | Kshs.34,800,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
34 | KTDA | Proposed Boiler House and withering building expansion for kapsara Tea Factory- Structural Steel works | Mar-15 | Jan-16 | Kshs. 28,908,062.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
35 | KTDA | Proposed Kapkoros Tea Factory( Motigo Site) Structural Steel | Mar-15 | Jul-15 | Kshs. 93,022,065.38 | ||||||||||||||||||||||||||||||||||||||||||||||||
36 | National Oil Corporation of Kenya | Construction of Service Station at Nakuru | Feb-15 | Jul-15 | Kshs. 86,495,048.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
37 | Tanzanian Petroleum Services Limited | Fabrication and supply of Above/UnderGround Fuel tank | Jan-15 | Nov-15 | |||||||||||||||||||||||||||||||||||||||||||||||||
38 | Engen Limited | Fabrication and supply of Above/UnderGround Fuel tank | Jan-07 | Continuous contract | |||||||||||||||||||||||||||||||||||||||||||||||||
39 | Sameer Business Park | Constructiuon of Sameer Food Court | Oct-15 | Feb-15 | Kshs. 22,495,048.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
40 | Sameer Business Park | Constructiuon of Sameer Food Court | Oct-15 | Feb-15 | Kshs. 22,495,048.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
41 | Hass Petroleum Limited | Fabrication and supply of Above/UnderGround Fuel tank | Nov-14 | Kshs. 9,250,000.00 | |||||||||||||||||||||||||||||||||||||||||||||||||
42 | Wartsila Eastern Africa | Tankages supply, fabrication & erection including stack fabrication and erection and other related works at Athi River II Power Project, Nairobi |
Jan-14 | Oct-15 | Kshs.175,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
43 | Kenya Railways Corporation | Construction and completion of relocation units and safety infrastructure in Kibera and Mukuru Nairobi |
Oct-13 | On Going | Kshs.861,672,633.80 | ||||||||||||||||||||||||||||||||||||||||||||||||
44 | Wartsila Eastern Africa | Supply, delivery, erection, and installation of civil, mechanical and electrical work for Wajir Power Plant, Kenya |
May-13 | Apr-14 | Kshs.61,600,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
45 | Tristar Transport LLC | Construction of 1no 500cm vertical tank for Jet A1 with foundations at Juba, South Sudan |
Feb-13 | Aug-13 | Kshs. 23,206,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
46 | American Consulate General | Construction services for Roof Replacement Project, Bujumbura | Feb-13 | Jun-14 | Kshs.42,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
47 | Tristar Transport LLC | Construction of a fuel Depot at Bor, South Sudan | Dec-12 | Aug-13 | Kshs. 58,700,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
48 | Total Outre – Mer, France | Fabrication and supply of fuel storage tanks | Nov-12 | Long Term Contract | |||||||||||||||||||||||||||||||||||||||||||||||||
49 | Isiolo Water and Sewerage Company | Fabrication, supply, installation and commissioning of 2no 165cm steel tanks and tower |
Nov-12 | Apr-13 | Kshs. 17,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
50 | Tristar Transport LLC | Fabrication and supply 26 nos of 53.4 kl fuel storage tanks | Oct-12 | Jan-13 | Kshs. 55,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
51 | Delmonte Kenya Ltd | Construction of a can processing Plant at Thika. | Aug-12 | Oct-13 | Kshs.128,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
52 | Total Kenya Ltd | Fabrication and supply of fuel storage tanks | Jun-12 | Continuous contract | |||||||||||||||||||||||||||||||||||||||||||||||||
53 | Ikon Prints Media Ltd | Supply and installation of billboards | Apr-12 | Feb-14 | Kshs.55,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
54 | KenolKobil Ltd | Repairs and Rehabilitation of Lubumbashi Terminal | Mar-12 | Jan-14 | Kshs.150,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
55 | KenolKobil Ltd | Supply and Installation of Floating Roofs at Kobil Tanzania Depot |
Jan-12 | Dec-13 | Kshs.9,500,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
56 | KenolKobil Ltd | Construction of Zambia Fuel Terminal | Dec-11 | Apr-14 | Kshs.350,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
57 | KenolKobil Ltd | Proposed Construction of Kobil View Point | Dec-11 | Feb-13 | Kshs.47,500,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
58 | KenolKobil Ltd | Construction of Burundi SICOPP depot | May-11 | Aug-12 | Kshs.234,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
59 | Hashi Energy Limited | Construction of Fuel Depot facility in Nairobi | Jan-11 | Aug-11 | Kshs. 57,871,314.16 | ||||||||||||||||||||||||||||||||||||||||||||||||
60 | PDL Toll | Supply and installation of Vertical tanks in Congo | Jan-11 | Jul-11 | Kshs. 185,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
61 | Kobil Petroleum Limited | Proposed Construction of a Service Station at Embakasi, Nairobi | Jul-10 | Feb-11 | Kshs. 40, 000, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
62 | Hashi Energy Limited | Fuel line installation, Corrosion production and instrumentation -Mombasa | Nov-10 | Aug-11 | Kshs. 42,803,618.93 | ||||||||||||||||||||||||||||||||||||||||||||||||
63 | Tristar Transport LLC DR Congo | Construction of a Fuel Depot at Kisangani DR Congo | Sep-10 | May-11 | Kshs. 160, 000, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
64 | KPLC Limited | Design and Construction of a Contanerised Diesel Power Station at Mfangano Island Kenya | Jul-10 | Mar-11 | Kshs. 20, 156, 599.20 | ||||||||||||||||||||||||||||||||||||||||||||||||
65 | Kenya Oil Company Limited / Kobil Petroleum Limited | Proposed Construction of a Depot at Makutano Thika | Jan-10 | May-10 | Kshs. 25, 603, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
66 | Hashi Energy Limited | Renovation of 4No.Vertical Tanks and installation of floating roof cover at Changamwe Mombasa Fuel Depot | Feb-09 | Jun-09 | Kshs. 31, 700, 500.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
67 | US Embassy Complex, Nairobi | Supply and Installation of Compound Automated Irrigation System at the US Embassy Compound | Feb-09 | Jun-09 | Kshs. 7, 300, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
68 | KPLC Limited | Improvement Works (Civil & Mechanical works) of a Contanerised Power Station at Mandera, Northern Kenya |
Jan-09 | Sep-10 | Kshs. 9,000, 700.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
69 | Rural Electrification Authority | Design and Construction of an Enclosed Diesel Power Station at Laisamis, Kiunga, North Horr, Lokichogio, Northern Kenya | Dec-09 | Nov-10 | Kshs. 187,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
70 | KPLC Limited | Design and Construction of a Contanerised Power Station at Merti, Northern Kenya | Dec-09 | Sep-10 | Kshs. 8, 000, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
71 | KPLC Limited | Design and Construction of a Contanerised Power Station at Baragoi, Northern Kenya | Aug-08 | Apr-09 | Kshs. 34, 878, 700.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
72 | Libya Oil Kenya Limited | Fabrication and supply of Above/UnderGround Fuel tank | Aug-08 | Continuous contract | |||||||||||||||||||||||||||||||||||||||||||||||||
73 | Kenya Shell Limited | Fabrication and supply of Double Wall AboveGround Fuel tank with leak detection Units | Aug-08 | Continuous contract | |||||||||||||||||||||||||||||||||||||||||||||||||
74 | Shell Uganda Limited | Fabrication and supply of Double Wall AboveGround Fuel tank with leak detection Units |
Aug-08 | Continuous contract | |||||||||||||||||||||||||||||||||||||||||||||||||
75 | US Embassy Complex, Nairobi | Supply and Installation of Double Walled Fuel tank and Construction of fuel depot & and associated Civil and mechanical works |
Sep-08 | May-09 | Kshs. 15, 580, 926.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
76 | General Printers Limited | Fabrication, Supply and Installation of Crane supporting structures | Jun-08 | Aug-08 | Kshs. 4, 408, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
77 | Kenya Shell Limited | Fabrication and Installation of double walled fuel storage tank | Jun-08 | Continuous contract | |||||||||||||||||||||||||||||||||||||||||||||||||
78 | Orad Limited | Fabrication and installation of Camera poles, Bollards, crash barriers, Civil works and electrical works at the United Nation Complex Gigiri | May-08 | Dec-09 | Kshs. 4, 133, 579.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
79 | Alliance Media Limited | Fabrication and supply of Billboards | May-08 | Sep-08 | Kshs. 85, 000, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
S/No | Name of the Employer | Name, Location and Type of project | Date of commencement | Status | Contract Value | ||||||||||||||||||||||||||||||||||||||||||||||||
80 | KPLC Limited | Completion of Design and Extension of a Power Station at Mpeketoni, Southern Kenya | Nov-07 | Feb-08 | Kshs. 8,900,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
81 | Kobil Petroleum Limited | 1200M3 Fire water tank at BOD-NJD Industrial Area | Oct-07 | Jun-08 | Kshs. 10,840281.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
82 | KPLC Limited | Design and Construction of a Contanerised Power Station at Hola, Northern Kenya | Aug-07 | Feb-08 | Kshs. 28,219,707.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
83 | KPLC Limited | Design and Construction of a Contanerised Power Station at Habaswein | Aug-07 | Mar-08 | Kshs. 28,219,707.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
84 | KPLC Limited | Design and Construction of a Contanerised Power Station at Elwak, Northern Kenya | Aug-07 | Mar-08 | Kshs. 28,219,707.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
85 | KTDA | Alterations and extensions – Building and civil Works ( Withering, production, Boiler house and ablution block) at KTDA Mudette Factory | Apr-07 | Jun-08 | Kshs. 15,362,286.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
86 | KTDA | Supply, Installaion of conveyor frame works and Drop chutes at Rorok Tea Factory | Apr-07 | May-07 | Kshs. 5,303,500.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
87 | Mocoh Petroleum Southern Sudan Ltd | Fabrication and supply of 50,000lit single skinned AG Fuel Storage tanks – 19 units | Mar-07 | Apr-07 | Kshs. 13, 668, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
88 | Kobil Petroleum Limited | Fabrication, supply & Delivery of 30m3 tonne 2300m dia storage tank c/w 100mm mineral wool installation and saddles – 5Nos | Jan-07 | Mar-07 | Kshs. 7,488,264.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
89 | Spencon Kenya Limited | Fabrication and supply of PST to be installed in Juba, Southern Sudan | Oct-06 | Dec-06 | Kshs. 38, 490, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
90 | Kenya Data Networks | Supply & Installation of equipment Generator Shelters for 4Nos Mariakani, Emali, Mtito Andei and Voi | Jul-06 | Sep-06 | Kshs. 11,136,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
91 | Bethlehem Construction & Engineering Co. Ltd |
Supply & Installation of Steel works & Roofing sheets for Warehouses and Fuel Depot in Southern Sudan | Jun-06 | Apr-07 | Kshs. 86, 970, 000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
92 | Desbro Kenya Limited | Fabrication, supply, and positioning of 50,000litre AG Storage tank | Jun-06 | Sep-06 | Kshs. 6,435,680.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
93 | Sasini Tea and Coffee | Proposed factory building for coffee mills at Kamundu | May-06 | May-07 | Kshs. 23,000,000.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
94 | KPLC Limited | Extension of power station and construction of Fuel Tank at Moyale | Mar-06 | Mar-06 | Kshs. 17,402,668.00 | ||||||||||||||||||||||||||||||||||||||||||||||||
95 | R.T (EA) Ltd | Supply of single skinned 44,000litres Tank suitable for mounting on a trailer | Mar-06 | May-06 | Kshs. 11,368,000.00 |